Sunday, September 26, 2010

Outside Heat Pumps To Add To Existing Oil Furnace

The interior work has begun!

Since Saturday, are now the interior decorator (that is so?) In the house. The Plumbers have been many, many lines installed and the electricians have completed all pre-drilled holes for sockets etc.. Since we were out of town at the weekend are only now new pictures:


In the bedroom - insulated and pre-installation of the radiator

view from the bedroom to the dressing room!

The pre-installation for The bathtub faucet!

Thursday, September 23, 2010

Pokemon Virtual Worlds Online

The roof is finished!

Now the remaining tasks are completed on the roof. Tomorrow will be full. The plumber, electrician and interior designers come to the site. Good thing they work in different levels, o).

Fertich ...: o)

The roof is sealed!

Wednesday, September 22, 2010

Blush B-lush Handbags

The windows and doors are there!

Rucki Zucki today are the windows and doors were installed. Now it really looks almost done: o). Foreign happens first is not much. The roofers will put up later this week the missing roof tiles and window manufacturers use the other 2 windows (in the guest bathroom and utility room fitted the glass is not). Now the building is and we can only with the key inside. Tomorrow and the day's next to the plumbing, insulation / Insulation / battens of the attic and the electrician also begins on Friday with the installation * happy *.
Here are the pictures of our beautiful little house o):


The garage entrance page with HWR!

The entrance - still missing and the two brick
window!
The Küchen-/Terrassenseite!

Our terrace sites!

Wednesday, March 11, 2009

Answers To Biology Lab Manual Questions

Greenbizblog rests

Bloggen macht Spaß - und Arbeit. Mir fehlt momentan die Zeit dazu, deshalb ruht der Greenbizblog erst einmal. Besuchen Sie mich doch stattdessen auf Twitter !