Sunday, October 3, 2010

Neutrogena Peel Where To Buy

addendum to the building construction contract with a difference

... this can sometimes be fun: o). See here:

real class!

Otherwise the construction is now finished as far as that today can lead the team to the interior plaster of the ceiling and the EC-plaster walls. Tomorrow we will then take the masonry column, which then prepared the construction "to clean Done. was

Saturday for the first Andreas sweat on the property. Before the floor is laid in the garage, he had to lay the hoses for the pump. This meant in the Garage 80 cm tief buddeln und außerhalb auch - dann die beiden PE-Schläuche durchführen, die dann an die Pumpe geschlossen werden. Güner war leider krank, so daß wir einen neuen Termin für Dienstag abgemacht haben.

Thursday, September 30, 2010

Eml Security Light Problems

Many, many outlets ...

...entstehen gerade! Die Räume oben haben nun alle Rigipsplatten erhalten, der Spitzboden ist mit einer zusätzlichen Untersparrendämmung versehen (hat damit KfW 85 Status)  und die Elektriker bereiten die Steck-/Antennen-/Cat-Dosen vor. Damit haben sie ordentlich viel zu tun, denn da ist dann doch einiges zusammen gekommen. Am Samstag treffen wir uns mit "Güner" , Fa. Galabau Yanar, mit which we want to go through the paving and irrigation of the property. This should then start in early November. The stone we have already selected and ordered in advance. Only the turf we move to the next year - which is too late her on the season, here are some pictures of the finished plaster walls: ready


The office now.!

between the dormer bedroom and dressing room
!

Tuesday, September 28, 2010

Pregnancy Congratulations Card

And on we go with the interior!

Now the insulation and battening completed and the sheetrock partially assembled. The plumber is well done and once the electrician is coming tomorrow for the remaining work.
The office is already complete with sheet-rock!

the bathroom!


The "dressing room" is ready!

Sunday, September 26, 2010

Outside Heat Pumps To Add To Existing Oil Furnace

The interior work has begun!

Since Saturday, are now the interior decorator (that is so?) In the house. The Plumbers have been many, many lines installed and the electricians have completed all pre-drilled holes for sockets etc.. Since we were out of town at the weekend are only now new pictures:


In the bedroom - insulated and pre-installation of the radiator

view from the bedroom to the dressing room!

The pre-installation for The bathtub faucet!