Tuesday, November 2, 2010

5 Weeks Pregnant And Low Hard Cervix

Fliesenarbeiten beendet!

are now laid all the tiles in the house and joined. Looks really great and the rooms feel all at once much larger. The shell was always the feeling that the rooms are so "small" would be - what indeed they are not really. Probably tomorrow our brick then gets the color right joint and the drainage of the garden and the house is addressed. On Monday begins the final assembly for plumbing and heating ... hehe ... finally a loo! Our "old kitchen" is now already working up to the living room. Have already started to scrub - whew ... work, but worth it. Is just a solid wood kitchen and not a cheaper DIY article. As will now turn some nice new porcelain knobs and then it is perfect for the HWR. Tonight, it's small at first cheering WERDER! Hopefully the rain will not: o ((((.


splash in the guest toilet



This vanity comes into the guest bathroom

The freshly jointed bathtub! Was still quite wet,
but I was cautious and I slipped from tile to tile
!

The back wall above the wash basin in the bathroom
(still wet)
"Make it your project" - the old kitchen!



Friday, October 29, 2010

Emergency Cosmetic Bag

Badewanne und Dusche sind da!

Today it finally happened: the bathtub and the shower are being used. Looks great. Now the tub over the weekend has to "dry" - that is the cement that they secured and then on Monday, the tiles come from the tub with the new LEDs. The LEDs can unfortunately not be used as intended, since we have only one tile Cross - are so Now 12 lights in the horizontal joint along the entire width distributed. The wall tiles in the guest bathroom, we have provided a splash guard are already on the wall. On Monday all the tile work are completed. Booyah!
morning we head off early the same and are expanding our "new / old" kitchen for the utility room with a lady in the new town. It is an older white country kitchen, which makes a little revision and send new porcelain knobs determined well. The trailer has been ordered for 8.30 clock. I hope we can build on next weekend ... let's see! Tomorrow read more. Today, however, means es erstmal: ISCHA FREIMAAK!!!

Im Wohnzimmer fehlen nur noch die Sockelleisten!

Die Badewanne wird eingesetzt!

Das Gäste-WC schreitet voran!



Die Dusche ist auch schon fast fertig!




Monday, October 25, 2010

Knight Electra Golf Clubs

Nun wird es "Habitable" o) Take care of your

The first tiles are here! This morning 7.30 clock on the building site: a "Horde" nimble craftsmen is ready to pour the concrete slab and apply the tiles. It went super fix - living room, the entire floor and the garage were then already finished this afternoon. The living room could then start the same tile - and here is already tiled and filled - looks great! Come tomorrow, the remaining floor areas and on Thursday the wall tiles, bath surround and shower. In the bathtub tile then our small LED lights to be introduced. Let's see much on it. Now a few pictures to:


The bathroom has a floor above, now
The tiles in the living room
The garage occupies almost finished



Thursday, October 21, 2010

Can You Pop Canker Sores

actually still around your building?

So I was yesterday morning from my future neighbor greeted with a laugh. Of course we do! We were there every day, but in recent days was not sooo much to see and on the weekend we were at the Hockenheim Ring. Incidentally, it was totally cool - a huge effort, the team operated as Audi!
When I came to the site yesterday morning, there were masses of polystyrene packages, which are provided as insulation for the underfloor heating. The craftsmen were well at the moment just go - there was no one on the ground - but today everything is laid and the heating company just lays out the heating coils. Our side door in the garage is now built in too and it's missing is the concrete slab and the roller door, we can already assume what. On Monday it is now with the floor and the tiles continue FREU *** ***! Have been with the Lord calls Albers and we have arranged for Monday morning 7.30 clock on the site. Here are a few pictures of our "snake", o):

The heating coils in the kitchen

Here in the bathroom above

The side door in the garage is now too!

Der Handtuch-Heizkörper wartet schon auf den Anbau