was supposed to on Tuesday yes, the framework for the roof and exterior work will be set up. As one can see from the photos, this is not the case.
The basement approval before about 2 weeks, we still say that the scaffolding was all discussed and the framework could be put up in the ditch. (The trench is unfortunately not yet filled, as the weather had prevented the final cellar work) As on Tuesday came the rigging, it was found that the framework can not be made up down in the ditch! On the one hand, the trench was too narrow in some places, on the other had the scaffolding does not bring enough material to make up down in the ditch to.
Long story short: we do not stand outside and at first you do not continue as planned.

Florian then be placed with smooth hair contact and behold, our site manager there was able to face short term, a construction crew available, which will complete the basement work. This is now in the short time course associated with some effort, but as we have previously seen Mr. Christ, it will work.
also a call to our diggers was positive: the company can Schantz us (presumably) set in early April also has a construction team are available to all to fill again.
Of course there are all not 100% guarantee but we are still thrilled by so much flexibility and responsiveness.
So at this point already a very big thank you to Mr. Christian (Glatt hair) and Mr. Miller (from Schantz)!