Aktueller Stand der Dinge

Good news:
The basement is completely sealed and was taken on Monday by our experts. Except for one thing, the criticism was that he had nothing to propose. This is for us to ever know good and important. Once the defect repaired and the insulation is installed, will be a new acceptance.

The House connections are prepared (the final work can only be made if it is filled) and the heating system is completely installed.
also been completed and the electrical work in the house.
We can in the next few days so that the screed is cast and then start the tile with their work.

Bad news: The lack
the basement must be first resolved yet, which means that the insulation has not yet been installed. The pit is thus still not filled, not the framework provided. For work outside the house so there is no new date.